var projects = [
  {
    "PROJ_SEQ":46504,
    "PIN":"008869.10",
    "TITLE":"GILEAD-BATCHELDERS GRANT",
    "SCOPE":"GUARD RAIL INSTALLATION AND REPLACEMENT",
    "WORK_PLAN_DESCRIPTION":"Guardrail installation and replacement in Gilead, Batchelders Grand and Stow.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"10-AUG-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 10-AUG-09",
    "EST_CONST_COST":31470,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":16338,
    "PIN":"010010.00",
    "TITLE":"DOVER-FOXCROFT, ROUTE 15",
    "SCOPE":"RECONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Highway Reconstruction: Beginning 0.59 of a mile southerly of the Range Road and extending northwesterly 1.29 miles to 0.13 of a mile southerly of the Bear Hill Road. ",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"03-AUG-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 03-AUG-09",
    "EST_CONST_COST":2889532,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":16344,
    "PIN":"010017.00",
    "TITLE":"LISBON TO SABATTUS, ROUTE 9",
    "SCOPE":"RECONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Highway Reconstruction: Beginning 0.33 of a mile northerly of Route 196 and extending northeasterly 6.75 miles to the Maine Turnpike Overpass.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"31-AUG-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 31-AUG-09",
    "EST_CONST_COST":9647991,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":16470,
    "PIN":"010158.00",
    "TITLE":"PORTLAND, VERANDA ST. BR#5052",
    "SCOPE":"BRIDGE REPLACEMENT",
    "WORK_PLAN_DESCRIPTION":"Bridge Replacement:  Veranda Street Overpass Bridge (#5052) over Canadian Railroad, located 0.30 of a mile north of Washington Street. ",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"12-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 12-SEP-09",
    "EST_CONST_COST":1584121,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"BRIDGE PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3490",
    "PROGRAM_MANAGER":"David Sherlock",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":18830,
    "PIN":"011072.00",
    "TITLE":"ELLSWORTH, ROUTE 1A",
    "SCOPE":"RECONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Highway Reconstruction: Beginning at the Rabbit Road and extending southeasterly 2.67 miles to 0.15 of a mile northerly of the Old Bangor Road.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"27-AUG-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 27-AUG-09",
    "EST_CONST_COST":6406660,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":22692,
    "PIN":"011844.00",
    "TITLE":"PORTLAND, BAYSIDE TRAIL",
    "SCOPE":"NEW CONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Bicycle\/Pedestrian Facility Improvement:   This project will design an extension of the Portland Trails system through the Bayside area of Portland along the abandoned Union Branch Rail Line extending from the Eastern Promenade Trail near Tukey's Bridge.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"14-AUG-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 14-AUG-09",
    "EST_CONST_COST":1907901,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"MULTIMODAL PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3420",
    "PROGRAM_MANAGER":"Norman Baker",
    "IS_MAPPABLE":false
  },
  {
    "PROJ_SEQ":20028,
    "PIN":"012676.00",
    "TITLE":"LINCOLNVILLE,KNIGHTS HLL #3194",
    "SCOPE":"BRIDGE REPLACEMENT",
    "WORK_PLAN_DESCRIPTION":"Bridge Replacement: Knights Hill Bridge# 3194 over Meservy Brook and located 0.17 of a mile northerly of Route 173.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"18-OCT-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 18-OCT-09",
    "EST_CONST_COST":265000,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"BRIDGE PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3490",
    "PROGRAM_MANAGER":"David Sherlock",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":29227,
    "PIN":"012737.00",
    "TITLE":"AUBURN, CENTER STREET AT JOLINE STREET AND STETSON",
    "SCOPE":"INTERSECTION IMPROVEMENTS W\/ SIGNAL",
    "WORK_PLAN_DESCRIPTION":"Intersection Improvement with a signal: Located at the intersection of Center Street, Joline Street, and Stetson Street.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"08-JUN-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 08-JUN-09",
    "EST_CONST_COST":610771,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":29753,
    "PIN":"012777.00",
    "TITLE":"TURNER, ROUTE 117",
    "SCOPE":"RECONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Highway Reconstruction: Beginning at Route 4 and extending northerly 2.39 miles to Upper Street.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"14-SEP-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 14-SEP-09",
    "EST_CONST_COST":2789145,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":31394,
    "PIN":"013059.00",
    "TITLE":"AUBURN, JOLINE DRIVE",
    "SCOPE":"RECONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Highway Reconstruction: Beginning at Center Street and extending westerly 0.18 of a mile to Turner Street.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"08-JUN-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 08-JUN-09",
    "EST_CONST_COST":379538,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":30458,
    "PIN":"013061.00",
    "TITLE":"LEWISTON, RUSSELL STREET",
    "SCOPE":"RECONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Highway Reconstruction: Beginning at the convergence of the ramps to Main Street, extending 0.51 miles easterly to Robinson Gardens. Project will include construction of left-turn storage lanes at certain intersections to improve safety. ",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"27-APR-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 27-APR-09",
    "EST_CONST_COST":2195197,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":30115,
    "PIN":"013085.00",
    "TITLE":"BIDDEFORD, ROUTE 111",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at Main Street (Route 9) and extending westerly 0.97 of a mile to 0.10 of a mile easterly of Marshall Avenue.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"06-JUL-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 06-JUL-09",
    "EST_CONST_COST":858457,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":30112,
    "PIN":"013086.00",
    "TITLE":"BIDDEFORD, ROUTE 9",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at Parkside and extending 0.95 of a mile to Alfred Street.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"06-JUL-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 06-JUL-09",
    "EST_CONST_COST":411012,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":30606,
    "PIN":"013104.00",
    "TITLE":"PORTLAND, AUBURN STREET",
    "SCOPE":"INTERSECTION IMPROVEMENTS W\/ SIGNAL",
    "WORK_PLAN_DESCRIPTION":"Intersection Improvement with signal:  Located at the intersection of Auburn Street and Lyseth Moore Drive.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"04-NOV-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 04-NOV-09",
    "EST_CONST_COST":244397,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"TRAFFIC",
    "LEAD_UNIT_CONTACT":"624-3620",
    "PROGRAM_MANAGER":"Stephen Landry",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":30105,
    "PIN":"013111.00",
    "TITLE":"SACO, NORTH STREET",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning 0.03 of a mile north of Park Street and extending 1.00 mile to 0.34 of a mile south of Hillview Avenue.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"17-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 17-SEP-09",
    "EST_CONST_COST":257164,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":29622,
    "PIN":"013341.00",
    "TITLE":"EASTERN TRAIL BIDD, ARUN, KENN",
    "SCOPE":"NEW CONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Eastern Trail, Bike\/Pedestrian trail from Rt. 111 in Biddeford to Route 35 in Kennebunk including a bike\/ped bridge over the Maine Turnpike.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"21-SEP-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 21-SEP-09",
    "EST_CONST_COST":1892315,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"MULTIMODAL PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3420",
    "PROGRAM_MANAGER":"Norman Baker",
    "IS_MAPPABLE":false
  },
  {
    "PROJ_SEQ":37497,
    "PIN":"014806.00",
    "TITLE":"PORTLAND, CUMBERLAND AVE",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Elm Street and extending easterly 0.29 of a mile to Franklin Arterial.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"01-DEC-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 01-DEC-09",
    "EST_CONST_COST":178354,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37498,
    "PIN":"014807.00",
    "TITLE":"WESTBROOK, EISENHOWER DRIVE",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at Saco Street and extending 0.88 of a mile to Spring Street. Includes shoulder resurfacing.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"12-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 12-SEP-09",
    "EST_CONST_COST":523938,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37499,
    "PIN":"014808.00",
    "TITLE":"SACO, BEACH STREET\/FERRY ROAD",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at Main Street and extending 1.11 miles to Pine Ridge Road.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"30-OCT-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 30-OCT-09",
    "EST_CONST_COST":289961,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37500,
    "PIN":"014809.00",
    "TITLE":"FALMOUTH, BROOK ROAD",
    "SCOPE":"FULL DEPTH RECLAIM W\/CEMENT",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at the Westbrook line and extending 0.48 of a mile to Blackstrap Road. The project will include drainage and the installation of curbing. ",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"12-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 12-SEP-09",
    "EST_CONST_COST":474956,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37502,
    "PIN":"014811.00",
    "TITLE":"PORTLAND, WESTBROOK STREET",
    "SCOPE":"1 1\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.34 mile south of Westbrook\/Portland city line and extending 0.89 mile southerly to Congress Street.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-NOV-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-NOV-09",
    "EST_CONST_COST":318824,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":43845,
    "PIN":"015114.50",
    "TITLE":"BRUNSWICK TO GARDINER,I-295N",
    "SCOPE":"RECONSTRUCTION",
    "WORK_PLAN_DESCRIPTION":"Highway Reconstruction: Beginning at southern end of Exit 28 off-ramp and extending northerly 23.88 miles to the Maine Turnpike toll booth. Rehabilitation includes concrete rubblization, new pavement structure, new guardrail and bridge rehabilitation.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"23-OCT-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 23-OCT-09",
    "EST_CONST_COST":34453362,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":45238,
    "PIN":"015114.60",
    "TITLE":"TOPSHAM \/W. GARDINER, CRSSOVER",
    "SCOPE":"OTHER HIGHWAY MAINTENANCE",
    "WORK_PLAN_DESCRIPTION":"Other Highway Maintenance: Topsham to Gardiner, I-295 NB, design and construct cross overs to maintain traffic for mainline work for PIN 15114.50; one crossover in Topsham & one in Gardiner.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"23-OCT-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 23-OCT-09",
    "EST_CONST_COST":2100000,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":false
  },
  {
    "PROJ_SEQ":19988,
    "PIN":"015613.00",
    "TITLE":"DAMARISCOTTA, SALT BAY BR#5974",
    "SCOPE":"BRIDGE REPLACEMENT",
    "WORK_PLAN_DESCRIPTION":"Steel Culvert Bridge Replacement: Salt Bay Bridge (#5974) over Salt Bay, located on the Damariscotta-Nobleboro town line.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"13-OCT-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 13-OCT-09",
    "EST_CONST_COST":467254,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"BRIDGE PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3490",
    "PROGRAM_MANAGER":"David Sherlock",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":20014,
    "PIN":"015614.00",
    "TITLE":"HALLOWELL, SECOND ST BR#0565",
    "SCOPE":"BRIDGE SUPERSTRUCTURE REPLACEMENT",
    "WORK_PLAN_DESCRIPTION":"Bridge Rehabilitation: Second Street  Bridge (#0565) over Maine Central Railroad, located 0.71 of a mile northerly of Wilson Lane.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"30-JUN-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 30-JUN-09",
    "EST_CONST_COST":1232549,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"BRIDGE PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3490",
    "PROGRAM_MANAGER":"David Sherlock",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":35785,
    "PIN":"015627.00",
    "TITLE":"TWP02 R08, LINCOLN SPUR #6074",
    "SCOPE":"BRIDGE DECK REPLACEMENT",
    "WORK_PLAN_DESCRIPTION":"Bridge Deck Replacement: Lincoln Spur Bridge (#6074), located over Interstate 95, northbound and southbound.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"15-DEC-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 15-DEC-09",
    "EST_CONST_COST":1349425,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"BRIDGE PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3490",
    "PROGRAM_MANAGER":"David Sherlock",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":36509,
    "PIN":"015689.00",
    "TITLE":"SULLIVAN, ROUTE 1 @ ASHVILLE",
    "SCOPE":"INTERSECTION IMPROVEMENTS W\/O SIGNAL",
    "WORK_PLAN_DESCRIPTION":"Intersection Improvements without signal:  Bypass lane construction located at the intersection of Route 1 and  the Ashville Road.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"09-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 09-SEP-09",
    "EST_CONST_COST":287375,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":36948,
    "PIN":"015716.00",
    "TITLE":"LOVELL, MAIN STREET",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.82 of a mile north of Christian Hill Road and extending northerly 1.66 miles to 0.12 of a mile north of West Lovell Road.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"30-JUL-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 30-JUL-09",
    "EST_CONST_COST":339759,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37258,
    "PIN":"015719.00",
    "TITLE":"SEBAGO, SEBAGO ROAD",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.03 of a mile South of Shore Road and extending northerly 0.90 miles to Northwest River Road.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"30-JUL-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 30-JUL-09",
    "EST_CONST_COST":285272,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37188,
    "PIN":"015720.00",
    "TITLE":"STANDISH, ROUTE 114",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.18 of a mile north of Route 35 and extending northerly 6.50 miles to 0.91 of a mile south of the Standish-Sebago town line.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"30-JUL-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 30-JUL-09",
    "EST_CONST_COST":1203301,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37157,
    "PIN":"015737.00",
    "TITLE":"CLINTON, BAKER STREET",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Route 11 and extending northerly 1.16 miles.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-AUG-09",
    "EST_CONST_COST":375340,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37026,
    "PIN":"015739.00",
    "TITLE":"FAIRFIELD, ROUTE 23",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Route 201 and extending northerly 0.65 of a mile to 0.19 of a mile northerly of Pishon Ferry Road.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-AUG-09",
    "EST_CONST_COST":102978,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37030,
    "PIN":"015746.00",
    "TITLE":"OAKLAND, FAIRFIELD STREET",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.03 of a mile southerly of Greeley Street and extending northerly 0.85 of a mile to 0.30 of a mile northerly of Municipal Drive.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-AUG-09",
    "EST_CONST_COST":173248,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37041,
    "PIN":"015747.00",
    "TITLE":"OAKLAND, PLEASANT STREET",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Oak Street and extending easterly 0.37 of a mile to Route 11.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-AUG-09",
    "EST_CONST_COST":98187,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37130,
    "PIN":"015750.00",
    "TITLE":"RANDOLPH-CHELSEA, ROUTE 9",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.05 of a mile South of the Chelsea-Randolph town line and extending Northerly 3.59 miles to  Augusta-Chelsea town line.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"28-MAY-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 28-MAY-09",
    "EST_CONST_COST":601652,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37016,
    "PIN":"015757.00",
    "TITLE":"WATERVILLE, OAK STREET",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Main Street and extending easterly 0.46 of a mile to College Avenue.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-AUG-09",
    "EST_CONST_COST":108519,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37196,
    "PIN":"015765.00",
    "TITLE":"EUSTIS, ROUTE 27",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.03 of a mile south of Route 16 and extending northerly 1.26 miles.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"03-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 03-SEP-09",
    "EST_CONST_COST":234899,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37046,
    "PIN":"015770.00",
    "TITLE":"JACKMAN, ROUTE 6",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 2.19 miles westerly of the Long Pond Twp town line and extending easterly 2.19 miles.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"23-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 23-SEP-09",
    "EST_CONST_COST":535693,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37259,
    "PIN":"015774.00",
    "TITLE":"SAPLING TWP, ROCKWOOD ROAD",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.05 of a mile westerly of the Sapling Township-Big Moose Township town line and extending easterly 6.10 miles to 0.46 of a mile westerly of Ski Resort Road.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"23-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 23-SEP-09",
    "EST_CONST_COST":1183787,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37194,
    "PIN":"015790.00",
    "TITLE":"PALMYRA, ELL HILL ROAD",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Somerset Avenue and extending northerly 6.27 miles to 0.03 of a mile northerly of Ford Hill Road.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"19-JUN-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 19-JUN-09",
    "EST_CONST_COST":1201333,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37203,
    "PIN":"015797.00",
    "TITLE":"CASWELL, VAN BUREN ROAD",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.72 of a mile southerly of the Hamlin town line and extending northerly 5.62 miles.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"06-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 06-AUG-09",
    "EST_CONST_COST":1667783,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":38120,
    "PIN":"015814.00",
    "TITLE":"AUBURN, TURNER STREET",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at Center Street and extending northerly 1.08 miles to 0.30 of a mile south of Mount Auburn Avenue.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"22-JUN-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 22-JUN-09",
    "EST_CONST_COST":381206,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37221,
    "PIN":"015830.00",
    "TITLE":"GARDINER, WATER STREET",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Cobbossee Avenue and extending easterly 1.10 miles to Route 201.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"18-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 18-SEP-09",
    "EST_CONST_COST":319604,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37201,
    "PIN":"015831.00",
    "TITLE":"LITCHFIELD, ROUTE 9",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.17 of a mile westerly of the Huntington Hill Road and extending easterly 3.99 miles to 0.06 of a mile westerly of the Bog Hill Road.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"28-MAY-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 28-MAY-09",
    "EST_CONST_COST":714526,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37250,
    "PIN":"015832.00",
    "TITLE":"OAKLAND, ROUTE 11",
    "SCOPE":"1 1\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Route 23 and extending northerly 4.46 miles to 0.01 of a mile northerly of Winter Street.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-AUG-09",
    "EST_CONST_COST":952097,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37098,
    "PIN":"015840.00",
    "TITLE":"WEST GARDINER, LEWISTON ROAD",
    "SCOPE":"1 1\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning 0.42 of a mile westerly of the I-95 Exit 102 On-ramp and extending easterly 1.69 miles to 0.11 of a mile easterly of the Gardiner town line.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"28-MAY-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 28-MAY-09",
    "EST_CONST_COST":717544,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37058,
    "PIN":"015843.00",
    "TITLE":"FAIRFIELD, NORRIDGEWOCK ROAD",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 1.87 miles west of  Routes 104\/139 and extending westerly 4.75 miles to 0.16 of a mile west of Bigelow Hill Road.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-AUG-09",
    "EST_CONST_COST":1125657,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37277,
    "PIN":"015849.00",
    "TITLE":"NEW SHARON, ROUTE 27",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.38 of a mile southerly of York Hill Road and extending northerly 2.65 miles to Route 2.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"29-JUL-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 29-JUL-09",
    "EST_CONST_COST":606208,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":38127,
    "PIN":"015851.00",
    "TITLE":"BANGOR, BROADWAY",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at the Interstate 95 southbound Exit 185 ramps and extending northerly 0.65 of a mile to Grandview Avenue.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"16-OCT-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 16-OCT-09",
    "EST_CONST_COST":188929,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37097,
    "PIN":"015853.00",
    "TITLE":"BANGOR, HOGAN ROAD",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at State Street and extending northerly 1.24 miles. to 0.17 of a mile north of Sylvan Road.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"27-JUL-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 27-JUL-09",
    "EST_CONST_COST":565888,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37209,
    "PIN":"015862.00",
    "TITLE":"EAST MACHIAS, ROUTE 1",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.37 of a mile northerly of Chase Mills Road and extending northerly 1.00 mile to 0.47 of a mile northerly of the Whiting town line.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"20-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 20-AUG-09",
    "EST_CONST_COST":289231,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37184,
    "PIN":"015875.00",
    "TITLE":"PITTSFIELD, PARK STREET",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at North Main Street and extending northerly 0.19 of a mile to Somerset Avenue.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"19-JUN-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 19-JUN-09",
    "EST_CONST_COST":55162,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37025,
    "PIN":"015882.00",
    "TITLE":"AUBURN, ROUTE 202",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Minot Avenue and extending northerly 0.68 of a mile to Lisbon Street.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"18-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 18-SEP-09",
    "EST_CONST_COST":279516,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37019,
    "PIN":"015885.00",
    "TITLE":"AUBURN, MINOT AVENUE",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at High Street and extending northerly 0.51 of a mile to Court Street.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"18-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 18-SEP-09",
    "EST_CONST_COST":210275,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":38646,
    "PIN":"015891.00",
    "TITLE":"FREEPORT, I-295 SB",
    "SCOPE":"OTHER HIGHWAY MAINTENANCE",
    "WORK_PLAN_DESCRIPTION":"Culvert Repair: Culvert replacement, located near Exit 22.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"24-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 24-AUG-09",
    "EST_CONST_COST":193100,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37299,
    "PIN":"015901.00",
    "TITLE":"PORTLAND, FOREST AVENUE",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at Avalon Road and extending northerly 1.12 miles to Castine Avenue.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"13-JUL-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 13-JUL-09",
    "EST_CONST_COST":700895,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":36944,
    "PIN":"015903.00",
    "TITLE":"PORTLAND, INTERSTATE 295 SB",
    "SCOPE":"MILL AND FILL PLUS",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.13 of a mile north of the Washington Avenue Southbound on-ramp and extending southerly 0.42 of a mile.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"29-AUG-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 29-AUG-09",
    "EST_CONST_COST":114242,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37285,
    "PIN":"015918.00",
    "TITLE":"EDGECOMB, ROUTE 1",
    "SCOPE":"1 1\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.08 of a mile south of Eddy Road and extending northerly 1.02 miles.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"28-MAY-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 28-MAY-09",
    "EST_CONST_COST":512452,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37215,
    "PIN":"015932.00",
    "TITLE":"CARATUNK, ROUTE 201",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 3.74 miles southerly of the The Forks Plantation town line and extending northerly 3.77 miles.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"23-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 23-SEP-09",
    "EST_CONST_COST":787207,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37286,
    "PIN":"015933.00",
    "TITLE":"FARMINGTON, ROUTE 2",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.58 of a mile east of Knowltons Corner Road and extending easterly 2.87 miles to 0.07 of a mile west of High Street.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"29-JUN-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 29-JUN-09",
    "EST_CONST_COST":516159,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37211,
    "PIN":"015936.00",
    "TITLE":"MOOSE RIVER, ROUTE 201",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.26 of a mile northerly of Sandy Stream Road and extending northerly 13.65 miles to 0.01 of a mile southerly of the Canadian border.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"23-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 23-SEP-09",
    "EST_CONST_COST":2325652,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37216,
    "PIN":"015941.00",
    "TITLE":"WEST FORKS PLT, ROUTE 201",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning 0.16 of a mile southerly of the Parlin Pond Township town line and extending northerly 13.62 miles to 2.60 miles northerly of the Parlin Pond Township-Jackman town line.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"23-SEP-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 23-SEP-09",
    "EST_CONST_COST":2504120,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37190,
    "PIN":"015943.00",
    "TITLE":"BANGOR, BROADWAY",
    "SCOPE":"3\/4\" OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning 325 feet east of the Interstate 95 northbound Exit 185 ramps and extending northerly 0.23 of a mile to the I-95 southbound Exit 185 ramps.",
    "REPORTING_STATUS":"5-Completed",
    "STATUS_DATE":"16-OCT-09",
    "MILESTONE":"Completion",
    "STATUS_DESC_DATE":"Construction completed on 16-OCT-09",
    "EST_CONST_COST":95344,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":37267,
    "PIN":"015948.00",
    "TITLE":"HAMPDEN, ROUTE 202",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at Western Avenue and extending northerly 4.02 miles to the Interstate 395 Exit 2 eastbound ramps.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"24-SEP-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 24-SEP-09",
    "EST_CONST_COST":1262169,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":36953,
    "PIN":"015953.00",
    "TITLE":"MATTAMISCONTIS TWP AND HOWLAND",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at the Mattamiscontis TWP town line and extending southerly 10.37 miles to 0.55 of a mile southerly of the Exit 217 on-ramp.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"04-MAY-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 04-MAY-09",
    "EST_CONST_COST":4071835,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":36954,
    "PIN":"015954.00",
    "TITLE":"T2 R8 NWP, INTERSTATE 95 SB",
    "SCOPE":"MILL AND FILL PLUS",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning at the T2 R8 NWP town line and extending southerly 7.06 miles to the Mattamiscontis TWP town line.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"04-MAY-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 04-MAY-09",
    "EST_CONST_COST":2608467,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":44537,
    "PIN":"016696.00",
    "TITLE":"DEER ISLE-SEDGWICK BR #3257",
    "SCOPE":"BRIDGE SUBSTRUCTURE REHABILITATION",
    "WORK_PLAN_DESCRIPTION":"Bridge Substructure Rehabilitation: Sedgwick Bridge (#3257) over Eggemoggin Reach, located on the Deer Isle-Sedgwick town line.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"14-OCT-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 14-OCT-09",
    "EST_CONST_COST":10474350,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"BRIDGE PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3490",
    "PROGRAM_MANAGER":"David Sherlock",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":20067,
    "PIN":"016745.00",
    "TITLE":"S. THOMASTON,SPRUCE HD BR#5578",
    "SCOPE":"BRIDGE REPLACEMENT",
    "WORK_PLAN_DESCRIPTION":"Bridge Replacement: Spruce Head Bridge (#5578), located 0.65 of a mile southerly of Route 73.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"01-SEP-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 01-SEP-09",
    "EST_CONST_COST":2196050,
    "SHAPE_TYPE":"point",
    "RTCODE":null,
    "LEAD_UNIT":"BRIDGE PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3490",
    "PROGRAM_MANAGER":"David Sherlock",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":45167,
    "PIN":"016775.00",
    "TITLE":"HOWLAND TO ALTON, I-95 SB",
    "SCOPE":"MILL AND FILL",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing: Beginning 0.55 of a mile southerly of the Exit 217 On-ramp and extending southerly 15.60 miles to the Alton\/Old Town town line.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"04-MAY-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 04-MAY-09",
    "EST_CONST_COST":4512577,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":47994,
    "PIN":"016819.10",
    "TITLE":"SMYRNA  - HOULTON: I-95 NB ",
    "SCOPE":"MILL AND FILL PLUS",
    "WORK_PLAN_DESCRIPTION":"Mill and Fill Plus: Begining 2.86 miles north of the Oakfield townline and extending northerly 13.64 miles to the Canadian Border.",
    "REPORTING_STATUS":"3-Awarded",
    "STATUS_DATE":"24-FEB-10",
    "MILESTONE":"Contract Award",
    "STATUS_DESC_DATE":"Contract awarded on 24-FEB-10",
    "EST_CONST_COST":5785745,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":44683,
    "PIN":"016822.00",
    "TITLE":"T2 R9 , I-95 SB",
    "SCOPE":"MILL AND FILL PLUS",
    "WORK_PLAN_DESCRIPTION":"Highway Resurfacing:  Beginning at the T2 R9 NWP town line and extending southerly 8.22 miles to the T2 R8 NWP town line.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"04-MAY-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 04-MAY-09",
    "EST_CONST_COST":2629768,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":45554,
    "PIN":"016983.00",
    "TITLE":"LUBEC, ROUTE 189",
    "SCOPE":"HIGHWAY WIDENING AND OVERLAY",
    "WORK_PLAN_DESCRIPTION":"Highway Reconstruction: Beginning at the intersection of Route 1 and extending easterly 11.19 to the U.S.-Canadian border.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"10-AUG-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 10-AUG-09",
    "EST_CONST_COST":3296575,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"HIGHWAY PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3480",
    "PROGRAM_MANAGER":"Bradford Foley",
    "IS_MAPPABLE":true
  },
  {
    "PROJ_SEQ":45137,
    "PIN":"017008.00",
    "TITLE":"S PORTLAND, LONG CREEK WATERSHE",
    "SCOPE":"ENVIRONMENTAL IMPROVEMENTS (MISC.)",
    "WORK_PLAN_DESCRIPTION":"Capital retrofits and infrastructure improvements that enhance quality treatment of stormwater runoff in an urban impaired stream watershed, as recommended by the Long Creek Watershed Planning Initiative and\/or required by federal stormwater management.",
    "REPORTING_STATUS":"4-Underway",
    "STATUS_DATE":"13-JUL-09",
    "MILESTONE":"Construction Begin",
    "STATUS_DESC_DATE":"Construction began on 13-JUL-09",
    "EST_CONST_COST":1687905,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"ENVIRONMENTAL OFFICE",
    "LEAD_UNIT_CONTACT":"624-3100",
    "PROGRAM_MANAGER":"Judy Gates",
    "IS_MAPPABLE":false
  },
  {
    "PROJ_SEQ":45434,
    "PIN":"017455.00",
    "TITLE":"PORTLAND, CBITD REPLACEMENT VS",
    "SCOPE":"CAPITAL EQUIPMENT PURCHASE",
    "WORK_PLAN_DESCRIPTION":"American Recovery and Reinvestment Act (ARRA) Ferry Boat Discretionary Grant funding for the purchase of a replacement ferry for the Casco Bay Island Transit District.",
    "REPORTING_STATUS":"1-Pre-Advertise",
    "STATUS_DATE":"21-APR-10",
    "MILESTONE":"Advertise Forecast",
    "STATUS_DESC_DATE":"Forecast advertise date is 21-APR-10",
    "EST_CONST_COST":5400000,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"MULTIMODAL PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3420",
    "PROGRAM_MANAGER":"Norman Baker",
    "IS_MAPPABLE":false
  },
  {
    "PROJ_SEQ":47050,
    "PIN":"017634.00",
    "TITLE":"LINCOLNVILLE ISLESBORO FENDERS",
    "SCOPE":"REHABILITATION",
    "WORK_PLAN_DESCRIPTION":"American Recovery and Reinvestment Act (ARRA) Ferry Boat Discretionary Grant funding for the Lincolnville\/ Islesboro ferry system fender replacement. Fiscal Year 2010.",
    "REPORTING_STATUS":"1-Pre-Advertise",
    "STATUS_DATE":"19-MAY-10",
    "MILESTONE":"Advertise Forecast",
    "STATUS_DESC_DATE":"Forecast advertise date is 19-MAY-10",
    "EST_CONST_COST":1200000,
    "SHAPE_TYPE":"line",
    "RTCODE":null,
    "LEAD_UNIT":"MULTIMODAL PROGRAM",
    "LEAD_UNIT_CONTACT":"624-3420",
    "PROGRAM_MANAGER":"Norman Baker",
    "IS_MAPPABLE":false
  }
];

var lastRefreshDate = new Date(1.269082894e+012);